#81862: "Contracts"
Na kaj se nanaša prijava?
Kaj se je zgodilo? Prosimo, izberi spodaj
Kaj se je zgodilo? Prosimo, izberi spodaj
Prosimo preverite ali že obstaja poročilo o isti zadevi
Če je tako, GLASUJTE za to poročilo. Poročila z največ glasovi se obravnavajo PREDNOSTNO!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Natančen opis
-
• Kopirajte / prilepite sporočilo o napaki, ki ga vidite na zaslonu, če ga imate.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Prosim, pojasnite, kaj ste hoteli storiti, kaj ste naredili in kaj se je zgodilo
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Kopirajte / prilepite besedilo, prikazano v angleščini, namesto v vašem jeziku. Če imate sliko zaslona te napake (dobra praksa), lahko uporabite Imgur.com za nalaganje in kopirate/prilepite povezavo do slike tukaj.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Je ta tekst dosegljiv v prevajalnem sistemu? Če ja, ali je bil preveden več kot 24 ur nazaj?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Natančno in jedrnato pojasnite svoj predlog, da bo čim lažje razumeti, kaj mislite.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Kaj je bilo prikazano na zaslonu, ko ste bili blokirani (prazen zaslon? Del vmesnika za igro? Sporočilo o napaki?)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Kateri del pravil ni bil upoštevan pri priredbi za BGA
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Je kršitev pravil vidna na seznamu potez? Če je, pri kateri številki poteze?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Katero potezo ste želeli narediti v igri?
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kaj ste poskušali narediti, da bi izvedli to potezo v igri?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). -
• Kaj se je zgodilo, ko ste poskusili to storiti (sporočilo o napaki, sporočilo v vrstici stanja, ...)?
• Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Na kateri točki v igri se je težava pojavila (katera navodila so bila prikazana)
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Kaj se je zgodilo, ko ste poskušali narediti to potezo v igri (sporočilo o napaki, sporočilo v vrstici stanja, ...)?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Prosim opiši problem s prikazom. Če imate sliko zaslona te napake (dobra praksa), lahko uporabite Imgur.com za nalaganje in kopirate/prilepite povezavo do slike tukaj.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Kopirajte / prilepite besedilo, prikazano v angleščini, namesto v vašem jeziku. Če imate sliko zaslona te napake (dobra praksa), lahko uporabite Imgur.com za nalaganje in kopirate/prilepite povezavo do slike tukaj.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). -
• Je ta tekst dosegljiv v prevajalnem sistemu? Če ja, ali je bil preveden več kot 24 ur nazaj?
Move #359
I fulfilled a contract and the dam construction on it was taken automatically because there was only one available space and I had the 3 Credits needed for that space.
I should be able to choose not to construct that dam (I may want to fulfill the contract for it to count for a bonus tile, without being interested by a dam on that position). • Kateri brskalnik uporabljaš?
Google Chrome v109
-
• Natančno in jedrnato pojasnite svoj predlog, da bo čim lažje razumeti, kaj mislite.
Contracts rewards are not mandatory (boardgamegeek.com/thread/2241819/article/32509710#32509710),
except for energy (boardgamegeek.com/thread/2184487/article/31754910#31754910). • Kateri brskalnik uporabljaš?
Google Chrome v109
Zgodovina poročil
The elevation granted by the contract was automatically build because there was only one place available.
Contract rewards are not mandatory.
The conduit granted by the contract was automatically built.
When there isn't only one place available, there is an option to skip building the structure. It should always be an option.
Dodaj nekaj k temu poročilu
- Drug ID mize/ premikanje ID-ja
- Ali je F5 rešil težavo?
- Se je problem pojavil večkrat? Vsakič? Naključno?
- Če imate sliko zaslona te napake (dobra praksa), lahko uporabite Imgur.com za nalaganje in kopirate/prilepite povezavo do slike tukaj.
